Company

Services

Projects Clientele Careers Locations Site Map

:::::::::::: Projects :::::::::::
Planning & Design
  Roads
  Bridges
  Railways
  Water Resources
  Buildings
  Urban Planning
  Urban    Infrastructure
 
 

Bridge Projects

 

aarvee Bridges Division has handled

  • 60 Major bridges

  • More than 300 Medium and Minor Bridges.

 

Projects Completed


The following are the Design Projects that are successfully completed

1.   Construction Supervision services for Rehabilitation and Upgradation (4/6 laning) from Km. 80 to Km. 200 in Vijayawada - Vishakhapatnam section of NH-5 in the State of Andhra Pradesh, India (Construction Packages AP-17, AP-18, AP-19 and AP-20) for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India.

     The project involves construction of 3 major bridges of lengths 2341.44m, 940.28m and 107.5m across Gowthami and Vasista rivers and Yenamadurru drain respectively, 7 medium bridges with lengths varying from 30m to 55m, 28 minor bridges and a number of RCC culverts and 4 No. of ROBs. The project is substantially complete as on 27th January 2005.

2.  Feasibility Study  and Preparation of Detailed Project Report for Rehabilitation and Upgradation (4/6 laning) from Km. 233 to Km. 388 in Vishakhapatnam - Bhubaneswar Section of NH-5 in the state of Orissa, India for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. This involves design of 5 major bridges, 29 minor bridges and 2 ROBs.

3.   Preparation of Detailed Project Report for “Construction of Bridge of length 4200m across river Godavari on upstream side of existing Rail Cum Road Bridge near Katheru at Rajahmundry connecting E-G-K Road at Km.82.4 at Kovvuru and NH-5 at Km.197.4 on Rajahmundry side in East Godavari District, Andhra Pradesh, India  for Andhra Pradesh Road Development Corporation, Government of Andhra Pradesh, India

4.  Consultancy Services for the preparation of Feasibility Study and Detailed Project Report for Arghistan Bridge on the Kabul – Kandhahar route and Mail Bridge on the Kandahar-Spikboldac route in Afghanistan.

Arghistan Bridge:    Length – 316.6 m. Span 21.1 m

Mail Bridge:            Length – 190 m.    Span – 21.1 m

5.   Designing of 10 major 2-lane bridges for Rural Roads in Warangal & Karimnagar districts of Andhra Pradesh Panchayat Raj Department, Government of Andhra Pradesh, India.

6.   Designing of Major 2-lane Bridge across Manair River in Karimnagar District, Andhra Pradesh, India.

   Top

Ongoing Projects

1.   Construction Supervision of 4 lane Road Over Bridge (Km 22.85 to Km 24.65) including approaches at Butibori on Nagpur-Hyderabad section of NH-7 in lieu of Level Crossing No. 113 in the State of Maharashtra for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India.

2.   Preparation of Detailed Feasibility Report for the work of “Construction of High Level Bridge across river Godavari at Km. 17/0 of Mahadevpur – Kaleswaram road in Karimnagar District to connect Chhattisgarh under BOT Scheme”.

3.   Proof Checking of Design of major bridges / viaduct portions on NH-1A from Jammu to Udhampur-Banihal Section of NH-1A in the State of Jammu & Kashmir for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India.

4.   Consultancy services for Investigation, Planning, Design and Supervision of ROB (666 m) on main Spinal Road from KPHB to Hi-tech city, Hyderabad, Andhra Pradesh for Hyderabad Urban Development Authority, Government of Andhra Pradesh, India

  Top

 

 
   
           
Home | About us | Why us | Contact us
© Copyright 2005 Aarvee Associates
All rights reserved