|
|
|
Environmental Engineering Services
Environmental
Impact Assessment and R&R Studies
Click
here for Services
Projects
completed
-
Preparation of EIA / EMP and SIA / R&R Report for
Rehabilitation and Upgradation (4/6 laning) from Km. 80 to Km. 200 in
Vijayawada - Vishakhapatnam Section of NH-5 (National Highway – 5) in
the State of Andhra Pradesh, India for National Highways Authority of India,
Ministry of Road Transport and Highways, Govt. of India.
-
Preparation of EIA / EMP and SIA / R&R Report for 4-laning and
strengthening of NH-7 in Nagpur – Hyderabad Section from Km. 309 to
Km. 447 in the State of Andhra Pradesh for National Highways Authority of
India, Ministry of Road Transport and Highways, Govt. of India.
-
Preparation of EIA / EMP and SIA / R&R Report for Construction of
Kumaradhara and Pasupudhara Dams as a source improvement Project on
Tirumala Hills and Water Supply line from dam site to the filtration plant
to Tirumala Town in Andhra Pradesh.
-
Preparation of EIA / EMP and SIA / R&R Report
for 4-laning and strengthening of
NH-7
in Nagpur – Hyderabad Section from Km. 175 to Km. 308 in the State of Andhra
Pradesh for National Highways Authority of India, Ministry of Road Transport
and Highways, Govt. of India.
-
Preparation of EIA /
EMP and SIA m/ R&R Report and Preparation of Economic and Financial
Analysis and Preparation of Financial Operating Plan
for works under C2 component of
APURMS Project
under
World Bank funded
Environmental Infrastructure projects
including water supply,
sanitation and other infrastructure facilities in four following municipal
towns of Andhra Pradesh (Phase - II).
-
Preparation
of EIA / EMP and SIA / R&R Report
for 4/6-laning of Selected Stretches/ Corridors of National Highways on BOT
basis under NHDP Phase III Programme (LOT IV): Tirupati-Tiruthani-Chennai
(length - 138 km) on NH-205 in the states of Andhra Pradesh and Tamil Nadu
-
Preparation of EIA / EMP and SIA / R&R Report
for 4/6-laning of Selected Stretches/ Corridors of National Highways on BOT
basis under NHDP Phase III Programme (LOT IV): Panikoili-Keonjhar-Rimuli
(length - 163 km) on NH-215 in the state of Orissa
-
Preparation of EIA / EMP and SIA / R&R Report
for the Project of Construction of 8-Lane Divided Carriageway Access Controlled
Expressway – II Ring Road (Phase-II - 137 km) to Hyderabad City for Hyderabad
Urban Development Authority
-
Preparation of EIA / EMP and SIA / R&R Report
for identification
of 4.5 lakh acres (1,82,110 Ha) new area to be irrigated for Sripada
Sagar Project,
Andhra Pradesh, India.
On-going
Projects
|
|
|
|