Company

Services

Projects Clientele Careers Locations Site Map

:::::: Projects ::::::
  Planning/Design
  Project    Management
  surveying
  GIS
 
 
 

Geographic Information Systems

GIS Projects                                          Click here for GIS Services

aarvee has expertise in implementing GIS and remote sensing solutions in the Planning & Design of

Water Resources

Assignments Completed

  • Delineation of Canal Distribution System and Generation of Command Area Register using GIS and Surface Hydrology Modeling for Sripadasagar Irrigation Project
    • Generation of DEM, Slope and Aspect
    • Deriving Ridges and Valleys
    • Delineation of Canal System and Chack Boundaries
    • Generation of Command Area Register

  • Preparation of Catchment area Treatment Plan for Sripadasagar Irrigation Project
    • Modeling sediment yield
    • Watershed analysis
    • Prioritization of watersheds

  • Preparation of GIS database for Sripadasagar and Dummagudem Irrigation Projects.
    • Digitization of Topographic features and administrative boundaries (District, Mandal, Village and Political)
    • Marking canal alignments
    • Generation of Tank Capacities
    • DEM and Slope Generation
    • Finding command area and Submergence areas and its statistics
    • Generation of soil maps for finding crop suitability and fertility
    • Mapping of Environmental base maps

  • Preparation of GIS database for Nagarjuna Sagar Modernization Project.
    • Digitization of Topographic features and administrative boundaries
    • (District, Mandal, Village and Political)
    • Marking canal alignments
    • Generation of Tank Capacities
    • DEM and Slope Generation
    • Finding command area and Submergence areas and its statistics
    • Generation of soil maps for finding crop suitability and fertility
    • Mapping of Environmental base maps

  Top

Urban Planning

Assignments Completed

  • Preparation of Master Plan for Sri Satya Sai Urban Development Authority (SSSUDA), Puttaparthi, A.P., India on ArcGIS platform
    • Digitization, Ground Verification and Updating of existing base maps,    and block sheets with Revenue maps, Ikonos Imagery aided with GPS
    • Regional scale landuse/landcover map using IRS LISS/PAN Imagery
    • Detailed Landuse/Landcover mapping using 1m resolution IKONOS Imagery

Ongoing Assignments

  • Nagari Urban Infrastructure Investment Plan: Base maps updating from Cartosat Imagery

  Top

Urban Infrastructure

Assignments Completed

  • Planning of Water Supply System for Secunderabad Cantonment Board.
  • Development of Tirumala Water Supply Network Model on ArcGIS platform

Ongoing Assignments

  • Development and implementation of Web GIS using LAMP Architecture (Linux, Apache, MySQL, PHP) for hosting Maps pertaining to the OST TIRZ Master Plan, City of Houston
  • Planning of Storm and Sewerage network for Vijayawada Municipal Corporation
  • Planning of Water Supply System for Nine municipalities of Hyderabad Metropolitan Water Supply and Sewerage Board(HMWS&SB).
 

  Top

Cadastral Surveys

Assignments Completed

  • Preparing Cadastral Records of Mallepalli Village using High Resolution Satellite Imagery (HRSI), DGPS and Total Station on ArcGIS platform
    • Identification and Generation of Land Parcels and associated features from HRSI
    • Generation of Land Parcels and associated features using Total Station Surveys
    • Estimating accuracy of HRSI based cadastral surveys with reference to total station based surveys.
    • Parcel Database Design with reference to Pahani and RoR 1-(B)
    • Preparation of Land Register
    • Preparation of Methodology for undertaking cadastral resurvey of a village using High Resolution Satellite Imagery (HRSI), DGPS and Total Station

  • Survey Scheduling of Integrated Land Information System (ILIS )-Nizamabad district
    • Database design and updating
    • Scheduling using VBA Environment
    • GIS Queries using VBA
    • Reports Generation

  Top

Transportation

Assignments Completed

  • Alternate Bypass alignments for the important towns along the NH-7 between Armur and Adilabad.
    • Digitization and Change Detection of Topographic features using Satellite Imageries
    • Mapping of Bypass alignments using GPS.
  • Landuse/Landcover mapping for the towns and the villages situated along the NH-7 using IRS-1C and P-6 satellite imageries.
  • Alternate Bypass alignments for the important towns along the NH-7.
  • Fixing of the railway alignment between Hastavaram/Rajampet to Krishnapatnam port of about 139 km.
  • Fixing of the railway alignment between Obulavaripalli to Krishnapatnam Port of  about 114 km.
    • Generated coordinates along the proposed alignment for every 30m
    • Mapping of all the features along the alignment within a buffer of 500m

Ongoing Assignments

  • Highway Alignments Fixing and Base Maps Preparation using satellite Imagery
    • Tirupathi-Tiruthani
    • Tiruvellur- Chennai
  • Railway alignments Fixing using satellite imagery
    • Mundra Port Project, Gujarath
    • Welspun Project, Gujarath

  Top

     












































Home | About us | Why us | Contact us
© Copyright 2004 Aarvee Associates
All rights reserved