1. Preparation of Detailed Project Report for “Construction of Bridge of length 4200m across river Godavari on upstream side of existing Rail Cum Road Bridge near Katheru at Rajahmundry connecting E-G-K Road at Km.82.4 at Kovvuru and NH-5 at Km.197.4 on Rajahmundry side in East Godavari District, Andhra Pradesh, India for Andhra Pradesh Road Development Corporation, Government of Andhra Pradesh, India 2. Feasibility Study and Preparation of Detailed Project Report for 4/6-laning of Selected Stretches/ Corridors of National Highways on BOT basis under NHDP Phase III Programme (LOT IV): Tirupati-Tiruthani-Chennai (length - 138 km) on NH-205 in the states of Andhra Pradesh and Tamil Nadu (Package No. NHDP-III/DL4/15) for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 3. Feasibility Study and Preparation of Detailed Project Report for 4/6-laning of Selected Stretches/ Corridors of National Highways on BOT basis under NHDP Phase III Programme (LOT IV): Panikoili-Keonjhar-Rimuli (length - 163 km) on NH-215 in the state of Orissa (Package No. NHDP-III/DL4/23) for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 4. Feasibility Study and Preparation of Detailed Project Report for 4/6 Laning from Km. 175.00 to Km. 309.00 (MH/AP Border-Armur) in Nagpur-Hyderabad section of NH-7 in Andhra Pradesh for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 5. Preparation of Detailed Project Report for Construction of 8-Lane Divided Carriageway Access Controlled Expressway – II Ring Road (Phase-II - 137 km) to Hyderabad City, Andhra Pradesh, India for Hyderabad Urban Development Authority, Government of Andhra Pradesh, India 6. Preparation of Detailed Project Report for Construction of 6 / 8 Lane Divided Carriageway Access Controlled Expressway IInd Ring Road (Phase I – 24.38 km) to Hyderabad City, Andhra Pradesh for Hyderabad Urban Development Authority, Government of Andhra Pradesh, India 7. Feasibility Study and Preparation of Detailed Project Report for Rehabilitation and Upgradation (4/6 laning) from Km. 80 to Km. 200 in Vijayawada - Vishakhapatnam Section of NH-5 in the State of Andhra Pradesh, India for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 8. Feasibility Study and Preparation of Detailed Project Report for 4-laning and strengthening of NH-7 in Nagpur – Hyderabad Section from Km. 309 to Km. 447 in the State of Andhra Pradesh, India for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 9. Feasibility Study and Preparation of Detailed Project Report for 4-laning and strengthening of NH-7 from Karur to Madurai from k.m 301.000 to k.m. 440.000 in the State of Tamil Nadu, India for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 10. Feasibility Study and Preparation of Detailed Project Report for Rehabilitation and Upgradation (4/6 laning) from Km. 233 to Km. 388 in Vishakhapatnam - Bhubaneswar Section of NH-5 in the state of Orissa, India for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 11. Preparation of Detailed Project Report (DPR) for Construction/Upgradation of Rural Roads and CD Works under Pradhan Mantri Gram Sadak Yojana for Rural Road Sector-II Project under ADB Assistance in the state of Orissa, India 12. Consultancy Services for the preparation of Feasibility Study and Detailed Project Report for Arghistan Bridge on the Kabul – Kandhahar route and Mail Bridge on the Kandahar-Spikboldac route in Afghanistan. Arghistan Bridge: Length – 316.6 m. Span – 21.1 m, Mail Bridge: Length – 190 m. Span – 21.1 m. 13. Feasibility Study of Network Improvement for the Proposed Road Sector Reform Project in Bangladesh under Third Road Rehabilitation and Maintenance Project (RRMP – III) (World Bank Funded) 14. Consultancy services for conducting Visual Road Condition Surveys of 3300 km of selected road stretches in Adilabad, Nizamabad, Karimnagar, Medak, & Warangal Districts in the State of Andhra Pradesh, India for the Roads & Buildings Department, Government of Andhra Pradesh, as part of the World Bank funded Andhra Pradesh State Highway Project, India. 15. Designing 153.7 km of State Highways in Anantapur and East Godavari districts of Andhra Pradesh under World Bank aided Andhra Pradesh Economic Restructuring Project for R&B Department, Government of Andhra Pradesh, India. 16. Designing of 321.36 km of State Highways and Major District Roads in Visakapatnam, Chittoor, and Srikakulam Districts of Andhra Pradesh under World Bank aided Andhra Pradesh Economic Restructuring Project for R&B Department, Government of Andhra Pradesh, India. 17. Designing 60.28 km of State Highway in Kurnool district of Andhra Pradesh for R&B Department, Government of Andhra Pradesh, India. 18. Designing of 373.6 km of Rural Roads in Adilabad district of Andhra Pradesh under World Bank aided Andhra Pradesh Economic Restructuring Project for Panchayat Raj Department, Government of Andhra Pradesh, India. 19. Designing of 10 major 2-lane bridges for Rural Roads in Warangal & Karimnagar districts of Andhra Pradesh Panchayat Raj Department, Government of Andhra Pradesh, India. 20. Preparation of Detailed Project Report for 150 kms of Rural Roads in Ghaziabad, Muzaffarnagar and Varanasi districts in the State of Uttar Pradesh, India under World Bank aided Diversified Agricultural Support (DASP). 21. Preparation of Detailed Project Report for 578 km of Rural Roads in the State of Orissa under Cyclone Reconstruction Component of World Bank aided Orissa Water Resources Consolidation Project, Orissa, India. 22. Preparation of Project Reports, Bid documents and assistance to the Rural Development Department of the State of Orissa to evaluate bid documents and award the contracts for a total length of 259.19 km of Rural Roads in Orissa, India. 23. Preparation of Project Reports, Bid documents and assistance to the Public Works Department in the State of Orissa to evaluate bid documents and award the contracts for a total length of 88.92 km of Rural Roads in Orissa, India. 24. Designing of Major 2-lane Bridge across Manair River in Karimnagar District, Andhra Pradesh, India. 1. Preparation of Detailed Feasibility Report for the work of “Construction of High Level Bridge across river Godavari at Km. 17/0 of Mahadevpur – Kaleswaram road in Karimnagar District to connect Chhattisgarh under BOT Scheme”. 2. Preparation of Detailed Feasibility Report for six laning of NH-5 from Srikakulam – Visakhapatnam (length 95 km) in the State of Andhra Pradesh under NHDP Phase-V (Lot-3) for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 3. Preparation of Detailed Project Report for Rehabilitation and Upgrading to 2 lane with paved shoulders configuration of National Highways 227 in the State of Tamil Nadu (Package: DPR/DL7/02) for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 4. Proof Checking of Design of major bridges / viaduct portions on NH-1A from Jammu to Udhampur-Banihal Section of NH-1A in the State of Jammu & Kashmir for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 5. Project Preparatory Studies for Package-III (Phase –I) for (i) Detailed Project Report for Upgradation of about 144kms road length and (ii) Carrying out Construction Supervision services for upgradation works during construction for Punjab Road and Bridge Development Board (PRBDB), Punjab, India 6. Consultancy services for Investigation, Planning, Design and Supervision of ROB (666 m) on main Spinal Road from KPHB to Hi-tech city, Hyderabad, Andhra Pradesh for Hyderabad Urban Development Authority, Government of Andhra Pradesh, India
|
|
Home
|
About us |
Why us
|
Contact us
|
|
© Copyright 2005 Aarvee
Associates All rights reserved |