|
|
|
|
|
|
|
| Company | Services | Projects | Clientele | Careers | Locations | Site Map |
|
Highway Projects
Assignments Completed Ongoing Assignments Assignments Completed Construction Supervision1. Construction Supervision services for access controlled 4-lane divided carriageway with 6-lane structures in Jaipur Bypass, Phase-II, Zone-D, connecting NH-8 (Km. 220) and NH-11 (Km. 246) in the State of Rajasthan, India for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 2. Construction Supervision services for World Bank aided Andhra Pradesh State Highway – Phase III Project (construction packages SH8, SH9, SH10, SH11 and SH12) for R&B Department, Government of Andhra Pradesh, India. 3. Construction Supervision services for Rehabilitation and Upgradation (4/6 laning) from Km. 80 to Km. 200 in Vijayawada - Vishakhapatnam section of NH-5 in the State of Andhra Pradesh, India (Construction Packages AP-17, AP-18, AP-19 and AP-20) for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. The project involves construction of 3 major bridges of lengths 2341.44m, 940.28m and 107.5m across Gowthami and Vasista rivers and Yenamadurru drain respectively, 7 medium bridges with lengths varying from 30m to 55m, 28 minor bridges and a number of RCC culverts and 4 No. of ROBs. The project is substantially complete as on 27th January 2005. 4. Construction Supervision services for four laning of Km 75 to Km 80 (near Eluru) in Vijayawada - Vishakhapatnam section of NH-5 in the State of Andhra Pradesh, India for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India.
1. Supervision Consultancy for emergent repair works of National Highways in Tamil Nadu for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 2. Performance Specified Maintenance Contract – II for providing Quality Assurance and Quality Control services as Technical Consultant from Km. 233 to Km. 418 (Ichapuram to Bhubaneshwar) in Bhubaneswar-Visakhapatnam section of NH-5 in the State of Orissa, India for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 3. Consulting Services for Road Safety Audit of Select National Highway / Expressway Sections on Western Transport Corridor and East - West Corridor under National Highways Development Project for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India.
Lender's Engineer 1. Lenders’ Independent Engineer’s services for 4-lane Bypass to Nellore Town from Km. 161.034 to Km. 178.200 in Chennai – Vijayawada Section of NH-5 in the State of Andhra Pradesh, India, for state Bank of India, Mumbai.
Ongoing Assignments Construction Supervision1. Construction Supervision of Domestic Funded Civil Projects of 4 Laning in the State of Assam, India on East – West Corridor Under Phase –II Programme of NHDP – From Km. 961.500 to Km. 1065 in Nalbari - Bijni section on NH-31 CS-II (A - 9) - and from Km. 1065 to Km. 1121 in Guwahati to Nalbari section on NH-31 CS - II (A - 8) for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 2. Construction Supervision of 4-laning from Km. 120 to Km. 153, and from Km. 153 to Km. 175 of Nagpur - Hyderabd Section of NH-7 in the state of Maharashtra, India on North - South Corridor under Phase - II Programme of NHDP (Consultancy Package NS-2/6) for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 3. Construction Supervision of 4-laning from Km. 120 to Km. 142, Bypass to Tirunelveli town from Km. 142 to Km. 160 and from Km. 160 to Km. 203 of Tirunelveli - Kanniyakumari Section of NH-7 in the state of Tamil Nadu, India on North - South Corridor under Phase - II Programme of NHDP (Consultancy Package NS-2/2) for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 4. Construction Supervision of six/eight lane access controlled expressway as Outer Ring Road to Hyderabad city – Phase-I (Gachibowli to Shamshabad) – 24.380 Km” in the State of Andhra Pradesh for Hyderabad Growth Corridor Limited, Government of Andhra Pradesh, India. 5. Construction Supervision of 4 lane Road Over Bridge (Km 22.85 to Km 24.65) including approaches at Butibori on Nagpur-Hyderabad section of NH-7 in lieu of Level Crossing No. 113 in the State of Maharashtra for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 6. Construction Supervision of Gujarat State Highways Project – Phase II for Public Works Department, Government of Gujarat, India. 7. Construction Supervision of Karnataka State Highways Improvement Project – Phase I for Public Works Department, Government of Karnataka, India. 8. Construction Supervision for Rehabilitation and Upgradation (4/6 laning) of 155 km long Ichapuram to Khurda road in Visakhapatnam to Bhubaneshwar Section of NH-5 in the State of Orissa for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. Package OR-7 of length 55.7 Km. is Rigid Pavement in this project 9. Construction Supervision of Four laning and Strengthening of the existing two lane stretches between Km. 393 to Km. 470 on Sikandara-Bara Route and between Km. 38 to Km. 115 on NH-2 in the State of Uttar Pradesh under the World Bank aided Third National Highway Project for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. The project involves construction of Rigid Pavement for the entire length (new lanes). 10. Construction Supervision of Four laning of NH-5 from Khurda to Bhubaneswar and Chandikhole to Balasore (Packages OR-I,OR-II and OR-III) in the State of Orissa for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. Independent Engineer1. Independent Consultancy Services for Construction of Access Controlled Highway from Km 10.100 to Km 29.500 on Bangalore – Nelamangala Section of NH-4 in state of Karnataka on BOT basis for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 2. Independent Consultancy Services for Km 278 (Kadtal) to Km 308 (Armur) in Nagpur – Hyderabad section of NH-7 in the State of Andhra Pradesh (Consultancy Package No.NS2/IC/AP-8) for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 3. Independent Consultancy Services for Rehabilitation and Up-gradation to four lane of Lakhnadon-MP/MH Border Section of NH-7 from Km 547.400 to Km 596.750 in the State of Madhya Pradesh on North-South Corridor (NHDP Phase-II) – Consultancy Package No.NS1/IC/MP-2 for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 4. Independent Consultancy Services for for laning from AP/KNT border (Km 463.6) to Nandihill crossing (Km 527) and Devanahalli village (Km 535) to Meenukunte village (Km 539) of NH-7, Consultancy Package NS-2/IC/KNT-1 for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 5. Independent Consultancy Services 4/6 laning of National Highways on BOT basis under NHDP Phase - III A - Consultancy Package No. IC/PhIIIA/NH-6/MH/012 on NH-6 in Maharashtra (Nagpur - Kondhali Section) for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 6. Independent Consultancy Services for 4/6 laning of National Highways on BOT basis under NHDP Phase - III A - Consultancy Package No. IC/PhIIIA/NH-11/RJ/007 on NH-11 in Rajastan (Bharatpur - Mahua Section) for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 7. Independent Consultancy Services for upgradation and strengthening Palanpur-Swaroopganj Section (Km. 340.00 to Km. 264.00 of NH-14 on BOT (Annuity) Basis (Consultancy Package No. EW-II/IC/BOT-RJ) for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 8. Independent Consultancy Services for 4/6 laning of 15 projects on North–South & East–West Corridors (NHDP – Phase II) in the States of Tamil Nadu, Andhra Pradesh, Karnataka, Kerala and Uttar Pradesh on BOT or BOT (Annuity) Basis - Consultancy Package No. NS 2/IC/AP-5: from end of proposed Kottakota bypass (Km 135.469) to Kurnool (Km 211) on NH-7 in Andhra Pradesh for National Highways Authority of India, Ministry of Road Transport and Highways, Government of India. 1. Lenders' Independent Engineer Services for 4-Laning of NH-3 from Km 265 to Km 380 on Dhule-Pimpalgaon Section on BOT Basis in the State of Maharashtra for State Bank of India, Mumbai, India 2. Lenders’ Independent Engineer Services for 4-laning from Trichy to Padalur on NH-45 on BOT basis in the State of Tamil Nadu, India for Canara Bank, India. 3. Lenders’ Independent Engineer Services for from end of proposed Kottakota bypass (Km 135.469) to Kurnool (Km 211) on NH-7 in Andhra Pradesh, India for Bank of India, New Delhi.
|
|
Home
| About us | Why us
| Contact us
|
|
© Copyright 2004 Aarvee
Associates All rights reserved |