Some of the assignments that were successfully completed
are mentioned below:
Field Survey, Geometric Design, Preparation of Drawings and Estimates for 4-laning and strengthening of existing 2-lane road stretches of 120 km. long NH-5 in the state of Andhra Pradesh as part of Golden Quadrilateral project. Apart from the above, survey, geometric design, preparation of drawings and estimates for 14 km long 4-lane Tadepalligudem Bypass was done.
Field Survey, Geometric Design, preparation of drawings and estimates for 4-laning and strengthening of existing 2-lane road stretches of 155 km. long NH-5 in the state of Orissa as part of Golden Quadrilateral project.
Field Survey, preparation of plans, drawings & Estimates for a total road length of 350 Kms of State Highways in Visakhapatnam, Vizianagaram, Srikakulam under APERP with World Bank Assistance for Engineer in Chief, R&B, Administration & Externally Aided Projects, Government of Andhra Pradesh, Hyderabad.
Field Survey preparation of plans, drawings & Estimates for a total road length of 450 Kms in Rural Roads in Adilabad district under Andhra Pradesh Economic Restructuring Project with World Bank Assistance for Chief Engineer, Panchayati Raj, Andhra Pradesh, Hyderabad.
Field Survey preparation of plans, drawings & Estimates for 200 km of rural roads in Ghajiabad, Mujaffarnagar districts for Diversified Agricultural Support (DASP) in Uttar Pradesh.